ISO 17025:2017 accredited laboratory · OGA-LE-115-24
Development finance · Boutique environmental & social firm

Environmental and social management, tailored to each operation.

We are a boutique firm: a senior, hands-on and agile team that designs every instrument around the operation, its risk and its local context — for projects financed by the IDB, IDB Invest, the World Bank and IFC.

Senior
The people who propose are the people who deliver
4
Institutions: IDB, IDB Invest, World Bank and IFC
6
Countries across Latin America and the Caribbean
A·B
High- and substantial-risk operations
Boutique approach

Boutique by design. Tailored by conviction.

We choose to work as a boutique firm: every operation is led by a senior, dedicated team that understands the project in depth, scopes to what it actually needs and responds with agility.

Every operation is different. Every instrument should be, too.
— 01

Senior team, always

The specialists you meet in the proposal are the ones who go to the field, write the instrument and defend it before the Bank.

— 02

Tailored scope

Scope is designed around the operation's risk, stage and budget — no generic templates, no unnecessary studies.

— 03

A single point of contact

Direct communication with the person coordinating the work. Fast decisions, no intermediate layers.

— 04

Close to the ground

Presence in Central America and first-hand knowledge of the regulatory, institutional and community context.

Who we serve

One technical capability, four different needs.

— 01

Bank teams

They need

Reliable, fast support for preparation, due diligence and supervision of operations.

We bring

Specialists fluent in the Bank's frameworks who work side by side with its staff.

— 02

Executing agencies

They need

To meet the loan's environmental and social requirements without slowing execution.

We bring

Approvable instruments, implementation support and capacity that stays with their team.

— 03

Private companies

They need

To reach IDB Invest or IFC financing with their E&S management in order.

We bring

Gap analyses, ESIAs and management systems that meet the lender's standard.

— 04

International firms

They need

A solid local partner to deliver in Central America with quality and field knowledge.

We bring

Fieldwork, laboratory, consultation and technical writing as local partner or subconsultant.

Frameworks we work with IDB ESPF IDB Invest Sustainability Policy World Bank ESF · ESS IFC Performance Standards
From national permit to lender standard

One baseline. Two requirements. One team.

Many operations need both the country's environmental license and the instrument the lender requires. We deliver them in a coordinated way, from the same field data.

— 01 · Data

A single baseline

  • Physical, social and biological fieldwork
  • In-house ISO 17025 accredited laboratory
  • Drones, GIS and remote sensing
— 02 · Country

National compliance

  • Environmental instruments and licenses before MARN
  • Forestry permits before INAB
  • Disaster-risk and health regulation (CONRED, MSPAS)
— 03 · Lender

Bank standard

  • Country-vs-lender gap analysis
  • ESIA, ESMF, ESMP and ESMS
  • Meaningful consultation and grievance mechanism
No duplicated studies Coordinated timelines One point of contact
Service lines

Bank-ready instruments, not just documents.

Every service scales to the operation — from Category B to Category A — and is measured by what it makes possible, not by page count.

— 01

Environmental & social due diligence

Risk and impact review, gap analysis between national regulation and the lender's standard, and subproject screening.

Financing decisions with risks clear from day one.
ESDDGap analysisScreening
— 02

Environmental & social impact assessment

Assessments for single works and strategic assessments for multi-works programs, built on our own field and laboratory baseline.

An instrument the Bank can approve, without rework.
ESIAESASESACumulative impacts
— 03

Management systems & frameworks

Design and implementation of management systems, frameworks for programs with subprojects and site-specific management plans.

Risk managed across the whole program, not work by work.
ESMSESMFESMP
— 04

Stakeholder engagement

Engagement plans, meaningful consultation and grievance mechanisms with field-tested procedures.

Social acceptance and fewer conflicts during execution.
SEPGRMPublic consultation
— 05

Resettlement & livelihoods

Plans and frameworks based on census, cut-off dates, eligibility and measures for vulnerable groups with a gender lens.

Orderly right-of-way release that protects livelihoods.
RAPLRPPS5
— 06

Disaster & climate-change risk

Multi-hazard assessments, risk management plans and climate-resilience modeling with IPCC scenarios.

Infrastructure ready for the hazards it will face.
DCCRADRMPCRRAEmergency plans
— 07

Gender, diversity & Indigenous Peoples

Gender and diversity plans, sociocultural analyses and cultural-pertinence plans built with communities.

Benefits that also reach those usually left out.
GenderCultural pertinencePS7 · PS9
— 08

Supervision, monitoring & geospatial

ESMP supervision, monitoring with an accredited laboratory, drone overflights, orthomosaics and GIS analysis.

Verifiable evidence of compliance, in the field and on the map.
DronesGISISO 17025Monitoring reports
— 09

Capacity building

Training, workshops and self-service tools so executing agencies can prepare their own instruments.

Capacity that stays in the institution after the consultancy ends.
TrainingToolsPortfolio assurance
— 10 · On the lender's side

Independent support to lenders

For banks and investors that need an independent, local view of the environmental and social performance of what they finance — before and after financial close.

Confidence that commitments are met in the field.
  • Independent reviewOf instruments prepared by third parties, against the applicable standard.
  • E&S action planDefinition and follow-up of the actions agreed with the borrower.
  • Post-closing monitoringPeriodic visits during construction and operation, with our own measurements.
  • Lender reportingPeriodic reports on compliance, findings and corrective actions.
How we work

Alongside every stage of the project cycle.

Senior multidisciplinary teams, a single point of contact and in-person, virtual or hybrid supervision. Deliverables in Spanish or English.

  1. 01

    Identification

    Early screening, risk classification and due diligence.

  2. 02

    Preparation

    ESIA, ESMF, ESMP, resettlement and disaster-risk plans.

  3. 03

    Consultation

    Disclosure, meaningful consultation and an operating grievance mechanism.

  4. 04

    Execution

    Supervision, field and laboratory monitoring, compliance reports.

  5. 05

    Portfolio

    Review of operation samples, recurring risks and lessons learned.

Frameworks we apply fluently
IDBESPF · Performance Standards 1–10 IDBSafeguard operational policies World BankESF · ESS 1–10 IFCPerformance Standards EPEquator Principles RegionMARN · CONRED · MSPAS · PAHO/WHO
Cumulative impact

What lies behind our work.

US$1 bn+
In operations supported with environmental and social instruments
Hundreds of families
And vendors covered by resettlement and livelihood plans
Thousands of users
Benefiting from the rural electrification programs we assessed
Dozens of works
And subprojects with their own instruments and management plans
Selected case studies

From challenge to verifiable impact.

A selection of operations where our work became approved instruments and lasting capacity within executing agencies.

Guatemala · IDB · GU-L1189 · Road infrastructure · ~US$170M

CA-9 North Corridor — Teculután to Mayuelas

Category ADrones + GIS
— Challenge

A ~126 km four-lane expansion across diverse terrain, with resettlement exposure and natural-hazard risk along the alignment.

— What we did

ESMF, ESA and ESMP with a stakeholder engagement plan and sociocultural analysis; operational-resilience assessment; structure-by-structure impact classification using drone orthomosaics and GIS.

— Impact

A bank-ready safeguards package with georeferenced evidence for precise resettlement and mitigation planning.

El Salvador · IDB · ES-L1172 · Municipal markets

Market regeneration — resettlement and livelihoods

Category APS5
— Challenge

Permanently relocating 570 commercial units and 736 people — 72.8% women — in La Libertad and Santa Tecla without disrupting their livelihoods.

— What we did

Resettlement and livelihood restoration plans with census-based characterization, gap analysis, cut-off dates and a gender lens; alongside the ESMS, ESIA, ESMP, SEP, environmental liabilities and a DRMP.

— Impact

An IDB-compliant resettlement instrument protecting 736 livelihoods through a fair, orderly transition.

Costa Rica · IDB · CR-L1159 · Citizen security · US$100M

Police System Modernization Program

Category B18 works
— Challenge

Eighteen works of five typologies — new build, demolition and rebuild, active sites, flood-prone areas and dense urban settings — on a compressed timeline.

— What we did

SESA, ESMS and ESA/ESMP by typology; SEP and grievance mechanism; meaningful consultation through geographic clusters covering 100% of the areas of influence.

— Impact

A differentiated, operable safeguards system to manage risk across the whole program, not work by work.

El Salvador · IDB · ES-L1158 · Energy · with CEL and DEC

Universal Access to Electricity (PAUE)

Category BCMIP6
— Challenge

Bringing electricity to ~19,749 users through grid extension, mini-grids and isolated solar systems, while assessing how climate change threatens the infrastructure's resilience.

— What we did

A tailored ESMS, ESMF/ESA/ESMP and SEP; a climate and disaster risk plan with SSP2-4.5 / SSP5-8.5 scenarios, downscaled models, quantitative matrices and residual risk.

— Impact

A climate-resilience approach validated with the executing agency, now a reference for El Salvador's energy sector.

Guatemala · World Bank · IBRD 8730-GT + GFF · Health & nutrition · US$109M

Crecer Sano — health system strengthening

Category BIndigenous Peoples
— Challenge

A national program against chronic malnutrition in seven departments, with works in dispersed Indigenous communities and an added COVID-19 emergency response.

— What we did

Systematized the ESMF as a self-contained instrument for MSPAS — screening, mitigation by component, grievance mechanism — plus a Cultural Pertinence Plan.

— Impact

A reusable compliance backbone that MSPAS applies across all works under the loan.

Guatemala · IDB · PIER & PAER · ~US$240M

A replicable safeguards engine, not just documents.

In the rural electrification program only a sample of subprojects could be assessed directly. We built a self-service model so the agency could produce, to the same standard, the ESA/ESMP for every remaining subproject.

  1. Subproject data — auto-populated fields
  2. ESA / ESMP — categorization, policies and baseline from a library
  3. Automated impact matrix — with and without associated facilities
  4. ESMP and residual risk — post-mitigation impact
  5. Consultation report — guided generator
Experience

Referenced operations.

PeriodOperationInstitutionCat.Scope
2026Sinú River urban revitalization (CO-L1324)Montería, ColombiaIDBAESIA and ESMP; resettlement plan under PS5 (503 families); stakeholder engagement.
2026Northwest productive integration — RN-20 (HO-L1265)HondurasIDBBESA, ESMP and ESMF; biodiversity action plan (PS6); ESMS.
2026Police System Modernization (CR-L1159)Costa RicaIDBBSESA, ESMS, site-specific ESA/ESMP, emergency response plan, SEP and grievance mechanism.
2024 – 2025Municipal markets rehabilitation (ES-L1172)La Libertad and Santa Tecla, El SalvadorIDBAESMS, ESIA, ESMP, SEP; resettlement and livelihood plans (736 people); environmental liabilities; disaster risk management plan.
2024 – 2025ESIA update, CA-9 North Corridor (GU-L1189)Teculután – Mayuelas, GuatemalaIDBAESMF, ESA and ESMP; SEP and sociocultural analysis; natural-hazard resilience; drones and GIS for resettlement.
2024 – 2025Crecer Sano — health and nutritionGuatemala · 7 departmentsWorld BankBESMF systematized for MSPAS; Cultural Pertinence Plan for Indigenous Peoples.
2024Social Inclusion System strengthening (CR-L1154)Costa RicaIDBBESA and ESMP for penitentiary infrastructure; SEP; gender and diversity plan; good-practice manual; disaster risk management.
2024Rural electrification PIER II (GU-L1192)GuatemalaIDBBESMF, ESA and ESMP; SEP; infrastructure resilience to natural hazards; contingency and monitoring plans.
2023 – 2024Civil Aviation Recovery (DGAC)Guatemala · 5 airfieldsWorld BankESMF and national-vs-ESS gap analysis; subproject screening and classification methodology.
2022 – 2023Rural Infrastructure for Good Living (P178573)San Marcos, Guatemala · 14 municipalitiesWorld BankBESMF under the ESS; reusable screening and reporting templates integrated with GEMS; consultations with a gender lens.
2023Universal Access to Electricity — PAUE (ES-L1158)El SalvadorIDBBESMS, ESMF, ESA and ESMP; SEP; climate and disaster risk plan with CMIP6 scenarios.
2022San Cristóbal academic campusGuatemalaIDB InvestBESIA under the sustainability policy; Climate Risk & Resilience Assessment (CRRA); ESMP.
2022Climate-risk due diligence — power distributionGuatemala · with Grid AdvisorsIFCVulnerability of transmission and distribution assets to extreme events; adaptation recommendations.
2021 – 2022CA-9 expansion, El Rancho – Teculután (GU-L1170)GuatemalaIDBAESIA for the four-lane expansion; consultation processes and resettlement planning.
2020Rural electrification PIER (GU-L1171)GuatemalaIDBBESMF; ESA and ESMP for sample subprojects; environmental and social baseline; engagement with institutions and communities.
2019Tropicalia Hotel & ResortSamaná Bay, Dominican RepublicIDB InvestESMS implementation and capacity building; compliance with safeguards and Performance Standards.
OngoingQuetzal Container Terminal — APM TerminalsPuerto Quetzal, GuatemalaIFCAnnual environmental and social monitoring reports; operational ESMP; dredged-material disposal alternatives.

Selected operations. Some assignments were delivered as technical partner to other firms, as indicated.

Why INAF

Local presence, international rigor.

Full technical capability — fieldwork, laboratory, GIS and senior specialists — with the closeness and flexibility of a boutique team.

— Resettlement

Depth in PS5

Resettlement and livelihood plans at urban and rural scale, with census, gender lens and measures for vulnerable groups.

— Climate

Multi-hazard approach

Disaster and climate-change risk plans across health, roads, energy, ports and penitentiary infrastructure.

— Technology

Drones, GIS and our own lab

Orthomosaics and 3D models, remote sensing, automated formats and an ISO 17025 accredited laboratory.

— Capacity

Knowledge transfer

Self-service tools and training for executing agencies in health, energy, infrastructure and security.

— Partnerships

A trusted local partner

Experience delivering alongside international firms, contributing fieldwork, laboratory and local knowledge.

— Portfolio

Analysis and assurance

Review of operation samples to identify recurring risks and support consistent application of the frameworks.

A Central American core, extended across the region.

In-person delivery and first-hand knowledge of the regulatory, institutional and community context. We work in Spanish and English.

Core · in person
GuatemalaEl SalvadorCosta Rica
Latin America & Caribbean
HondurasColombiaDominican Republic
FAQ

What we are often asked.

Question not listed? Write to us and we'll answer directly.

How does a lender's ESIA differ from the country's environmental study?

The national study responds to local regulation and is used to obtain the permit. The lender's assessment goes further: it adds social, labor, disaster-risk and engagement aspects under the lender's own framework. Most operations need both, which is why we build them on the same baseline.

What is the difference between an ESMS, an ESMF and an ESMP?

The ESMS is the system an organization uses to manage its environmental and social risks on an ongoing basis. The ESMF defines how subprojects not yet known in detail will be assessed and managed. The ESMP is the concrete set of measures for a specific work or site.

When is a resettlement plan required?

When the operation involves land acquisition or restrictions on land use that cause physical or economic displacement — for example, homes, businesses or productive activities in the works area. The plan defines who is eligible, how they are compensated and how livelihoods are restored.

What is a gap analysis?

A comparison between what national regulation requires (or what a project already has) and what the lender's standard requires. It identifies what is missing and how to close it, avoiding redoing studies that are still useful.

Can you act as local partner to an international firm?

Yes, frequently. We contribute fieldwork, laboratory, community consultation, regulatory knowledge and technical writing, integrated into the lead firm's team and methodology.

Do you deliver in English and work outside Guatemala?

Yes. We work in Spanish and English and deliver in the language of the country where the operation takes place. Our core is Central America, with experience in other Latin American and Caribbean countries.

Next step

Preparing an operation with multilateral financing?

Banks, executing agencies and consulting firms: let's talk about the environmental and social instruments your operation needs.